设计兵团首页 > 展会报道 > 建筑室内 >Technology Building in Leuven(鲁汶的科技大楼)——de Jong Gortemaker Algra Architects
来源:设计兵团

Technology Building in Leuven(鲁汶的科技大楼)——de Jong Gortemaker Algra Architects

发布时间:2019-09-05 16:54:54 79 0

【此方案的视频/教程】

【此方案的3d模型】

糖果岛


2017-07-20注册
  • 兵豆142个
  • 兵币15260个
  • 提现0
  • 发布展会627个
  • 发布模型1005个
  • 获赞0个
  • 粉丝39个

5.jpg建筑师:de Jong Gortemaker Algra Architects

位置:Herestraat 49, 3000 Leuven, Belgium

类别:University

总建筑师:THV Ar-Te, de Jong Gortemaker Algra – Stabo architecten

面积:5875.0 m2

项目年度:2013

摄像:Marcel Van Coile , Toon Grobet

厂长:EQUITONE, Etex Colombia

The new building on the edge of the university campus is not merely a functional building one has to accept, and certainly not an unavoidable intrusion either. Indeed, it enhances the visual appeal of the quarter and accommodates, on some 6000 square metres floor area, the quarter’s energy and data centre. For functional reasons the three-storey building is all but opaque. There are numerous ventilation openings but few places that could be glazed, such as the two staircases on either of the narrow sides and an area on the first floor.

From the first floor upwards, perimeter walls are closed with externally insulated precast concrete components. The thermally insulated panels are finished with black acrylic lining. In front of those, an aluminium subframe supports 600 millimetre deep fibre cement vanes. The secondary façade serves as an additional layer of thermal protection and a shield from rainwater and sunlight. Just as importantly though, and given its form and colour, it is the material that lends the building’s exterior its attractive appearance. The vanes in front of the closed exterior walls have been mounted at a pitch of 30 degrees from the vertical. In frontal view and from a distance the façades therefore appear opaque, displaying a distinct horizontal structure. Viewed at an angle, the vanes seem to converge towards a distant vanishing point. In close-up view the appearance changes yet again as the gaps between the vanes towards the top of the building become seemingly wider.

Vanes in front of glazed wall sections have a 60 degree pitch, proffering yet another façade pattern that changes during a 24 hour cycle: during the day it presents more of a dark background, but when lit from behind these surfaces become quite bright.Source project description: A D Architecture Detail No 41, Karl Kraemer Verlag Stuttgart, 2013

大学校园边缘的新建筑不仅仅是人们必须接受的功能性建筑,当然也不是不可避免的入侵。事实上,它增强了该小区的视觉吸引力,并在大约6000平方米的建筑面积上容纳了该小区的能源和数据中心。出于功能原因,这座三层建筑几乎是不透明的。有许多通风口,但很少有地方可以上釉,比如狭窄两边的两个楼梯和一楼的一个区域。

从一楼向上,围墙用外部绝缘的预制混凝土构件封闭。隔热板用黑色丙烯酸衬里装饰。在此之前,一个铝制副车架支撑着600毫米深的纤维水泥叶片。二次立面是额外的热防护层,也是雨水和阳光的屏障。同样重要的是,考虑到它的形状和颜色,正是这种材料赋予了建筑的外观迷人的外观。封闭外墙前的叶片安装间距与垂直方向成30度。因此,从正面看,从远处看,正面显得不透明,显示出明显的水平结构。从某个角度看,叶片似乎朝着一个遥远的消失点会聚。在特写镜头中,随着朝向建筑物顶部的叶片之间的间隙变得似乎更宽,外观再次发生变化。

玻璃墙前的叶片间距为60度,提供了另一种在24小时周期内变化的立面模式:白天,它呈现出更多的黑暗背景,但当从这些表面后面照亮时,它变得相当明亮。

来源项目描述:建筑设计 细节第41号,卡尔·克雷默·弗拉格·斯图加特,2013年

1.jpg


选择付费方式×

浏览本方案图片需支付0兵豆

兵豆支付     需支付0兵豆,您的兵豆不足(个)   去 充 值
您还可以点这里一键购买整个展会的张图片
购买展会 选择付费方式×
兵豆支付     支付兵豆,当前余额兵豆。
不需要购买整个展会,返回仅购买此方案
展会一键购买成功!×

这个展会的所有图看您已购买成功

前往查看展会页 留在本页
建筑室内Technology,Building,in,Leuven
发评论奖兵币,看教程下模型 登录 注册
Contents昨日... 已有...人提现 本月提现冠军... 本月充值冠军... 最新动态:...
...年创办 ...万会员 ...万主题 ...个展会 ...个模型 ...个教程 ...位设计师 ...个展览工厂 ...个展览公司 ...个展商 ...个主办 ...个展馆
2024-05-04 13:00:00--3.145.83.150--2024-05-04 18:00:00
模型下载 ×
模型 价格 近一年下载次数 操作
该方案无可下载模型,访问 模型首页